BMW opens US battery plant for electric iX5

Jet Sanchez
  • Sign in required

    Please sign in to your account to add a vehicle to favourite

  • Share this article

Packs assembled near Spartanburg factory

Packs assembled near Spartanburg factory

  • BMW's new Woodruff plant has begun assembling Gen6 battery packs for electric vehicles built at Spartanburg.
  • The iX5 will be the first fully electric BMW assembled in the United States.
  • More than 300 employees work alongside 250 robots, with digital training and automated quality monitoring.

BMW has opened the South Carolina factory that will assemble battery packs for its new electric iX5, putting another part of the SUV's production chain close to home.

Plant Woodruff began series production in November and officially opened on 13 November. It supplies BMW's Spartanburg vehicle factory about 24km away, where the iX5 will become the first fully electric BMW assembled in the United States.

Opening Ceremony of BMW Group Plant Woodruff

The battery operation also has a longer list of vehicles ahead of it. BMW plans to build at least six fully electric models at Spartanburg by 2030.

From round cells to complete packs

Woodruff assembles high-voltage battery packs using supplied cylindrical cells and BMW's sixth-generation electric-drive technology, known as Gen6. Its cell-to-pack construction puts those round cells directly into the battery pack.

Close view of cylindrical cells and their supporting structure at Woodruff

More than 300 employees work at the site alongside 250 robots. BMW uses artificial intelligence to monitor production quality, with completed batteries going through end-of-line inspection.

The preparation extends beyond the machinery. Digital twins and virtual-reality training let staff rehearse production tasks, adding a simulated version of the work to their training before they perform it on the line.

Virtual-reality controller and simulated production display used in Woodruff training

A fourth Gen6 assembly site

Woodruff follows three other Gen6 battery assembly locations. Debrecen in Hungary began production in October 2025, followed by Irlbach-Straßkirchen in Germany and Shenyang in China in October 2026. San Luis Potosí in Mexico is due to follow in 2027.

The South Carolina project has taken more than three years to reach this point. Ground was broken in June 2023, construction began that September, and equipment installation followed in September 2024. Pre-production testing started in the northern summer of 2025, ahead of this month's series-production start.

Gallery